(804) 614-5718

Paving Company
Paving Services
Paving Gallery
Paving Estimate
Paving Contact
   
 

- Driveway Paving
- Parking Lot Paving
- Asphalt Removal
- Asphalt Replacement
- Asphalt Patching
- Hot Mix Overlays
- Pavement Restoration
- Pavement Sealers
- Tar and Chip Paving
- Cold-Pour Crack filler
- Parking Lot Striping
- Stone Hauled and Laid


visa mastercard

 

I am very happy with the work that Dean's Asphalt Paving did on my driveway. They did the work in a timely fashion and at a fair price. I would recommend the company to anyone with paving needs.

Vickie B

 

 


Dean’s Asphalt Paving Services

For new asphalt we recommend you wait
at least 3 months to use any seal coat.
Some color choices are available in sealers.

What we can do for your Driveway or Paking Lot
 
1. Stone, dirt, or new driveway/parking lot

-

aggregate base of stone - 4 inches of rock (crush & run stone)
- then two inches of a finer topping mix
   
2. Existing driveway/parking lot
- remove areas where the level of existing driveway does not allow proper application for two inches of asphalt
- apply liquid tar tack coat to existing surface
- then apply two inches of surface hot mix asphalt and compact.
   
3. Replace existing driveway/parking lot
- If existing driveway is un-reparable we will remove driveway
- re-grade underlying base
- add crush and run stone as needed for proper base
- compact base
- repave with three inches of surface hot mix asphalt and then compact.
   
4. Surface Patch driveway/parking lot
- If existing driveway has pot holes, cracks, etc. and is repairable.
- Remove loose broken asphalt, make sure there is a proper base underneath.
- apply liquid tar tack coat to surface to be patched.
- patch with hot mix asphalt feathering patch to existing surface.
   
5. Saw Cut Patch driveway/parking lot
- Saw cut and remove area that need to be patched.
- Repair and make sure there is a proper base underneath.
- Lay three inches of hot mix asphalt and compact to match levels of surrounding areas. (walkway, garage, etc..)
   
6. Seal Coat driveway/parking lot
- Edge driveway remove dirt and debris by blowing clean
- Fill cracks with a crack filler
- Apply asphalt sealer to existing surface.
   
   
   

For heavy duty construction trucks, highways, etc...
- aggregate base of stone (6-8 inches of rock (crush & run)
- 3 inches of Binder or base mix asphalt-
- primer that goes in-between liquid tar tack coat
- then two inches of finer topping mix

CALL
(804) 614-5718
or email us

 

Driveway paving contractor, asphalt paver, seal coating in Richmond VA

Home Page / Asphalt Company / Paving Services / Paving Gallery / Paving Estimate / Paving Contact